Subsea Boosting Hintergrundneu

Subsea Boosting Milestones

 1934

 

Development of Twin-Screw Pumps, Patent granted 

 1985

 

Introduction Multiphase Pumps 

 1993

 

Multiphase MPC Patent granted 

 1999

 

1st Wet Gas Compressor 

 2000

 

Subsea Pump (Demo 2000, Kvaerner) developed and tested 

 2002

 

Multiphase 100 bar Booster - serial installation of MPCs 

 2006

 

1st Twin-Screw Subsea installation CNRL Lyell 

 2007

 

Subsea Pump World Record BP King - depth and distance 

 2009

 

Fabrication of frame size 11 MPP - 4 MW shaft power 

 2009

 

Multiphase Twin-Screw Motor - Wellhead Power Generator 

 2009

 

1st vertical Twin-Screw Multiphase Pump CMPC installed at StatoilHydro

 2010

 

25 000 000 operating hours experience in Multiphase Boosting 

 2010

 

Development of the Subsea Oil and Gas Skimmer SOGS