British Petroleum King Field, Gulf of Mexico
Pumptype: MPC 335 The scope of supply consist of 3 SMPC 335, to be installed at 1600 m depth and 33 km from the gathering station in the Gulf of Mexico, achieving the world record tieback and world record depth. The BP-King project is the first subsea twin screw multiphase pump in the Gulf of Mexico.
Medium:
| oil, gas, water |
| GVF @pump suction conditions: | 70 - 98 % |
| Maximum differential pressure: | 750 psi (50 bar) |
| Pump inlet pressure: | 640 - 1,835 psia |
| Nominal operational speed: | 800 - 2,000 rpm |
| Pump shaft power rating: | 1.0 MW |
| | |
<< back |
|